Communications · Article published on LinkedIn on 6 April 2026

How the Lack of Optical Fibre in Northern Portugal Threatens the Iberian Energy Transition

The systemic risk of digital macrocephaly: international gateways concentrated in Lisbon and Sines

Gaspar do Amaral · 6 April 2026

Translated from the Portuguese original. This version was issued on 30 October 2026.

Original illustration of the article, with its texts in Portuguese and English: “O risco sistémico da macrocefalia digital em Portugal — como a falta de fibra ótica a Norte ameaça a transição energética ibérica” (the systemic risk of digital macrocephaly in Portugal — how the lack of optical fibre in the North threatens the Iberian energy transition). On the left, “Cenário atual: macrocefalia e risco sistémico” (current scenario): a map of Portugal with fibre routes converging on Lisbon/Sines, warnings of “ponto único de falha” (single point of failure), “concentração excessiva a Sul” (excessive concentration in the South) and “falta de conetividade direta” (lack of direct connectivity) for Porto/Leixões and northern wind farms and industry. On the right, “A solução: o anel topológico ibérico” (the solution: the Iberian topological ring): a cable landing station (CLS) in the North and a mesh of routes across the Peninsula, with “redundância e resiliência” (redundancy and resilience) and “transição energética otimizada” (optimised energy transition). Below: “Autor: Eng Gaspar do Amaral” and a note stating that the holistic integration of digital infrastructure along the Atlantic façade is fundamental to the digital and energy sovereignty of the Iberian Peninsula. © Aprecisa.com
Original illustration of the article, with its texts in Portuguese and English: “O risco sistémico da macrocefalia digital em Portugal — como a falta de fibra ótica a Norte ameaça a transição energética ibérica” (the systemic risk of digital macrocephaly in Portugal — how the lack of optical fibre in the North threatens the Iberian energy transition). On the left, “Cenário atual: macrocefalia e risco sistémico” (current scenario): a map of Portugal with fibre routes converging on Lisbon/Sines, warnings of “ponto único de falha” (single point of failure), “concentração excessiva a Sul” (excessive concentration in the South) and “falta de conetividade direta” (lack of direct connectivity) for Porto/Leixões and northern wind farms and industry. On the right, “A solução: o anel topológico ibérico” (the solution: the Iberian topological ring): a cable landing station (CLS) in the North and a mesh of routes across the Peninsula, with “redundância e resiliência” (redundancy and resilience) and “transição energética otimizada” (optimised energy transition). Below: “Autor: Eng Gaspar do Amaral” and a note stating that the holistic integration of digital infrastructure along the Atlantic façade is fundamental to the digital and energy sovereignty of the Iberian Peninsula. © Aprecisa.com

The Systemic Risk of Digital Macrocephaly in Portugal: How the Optical Asymmetry in the North Threatens the Energy Transition and Iberian Resilience

Over more than 35 years of experience accumulated on the front line of Communications Engineering, devoted to the joint integration of land, sea and air transport and communications systems, the macrocephaly that concentrates the very-high-capacity international gateways on the Lisbon–Sines axis appears to me as one of the most severe structural constraints on the national landscape. As amply documented by the researcher Nicole Starosielski in her cartography of undersea infrastructure, and echoed by the network sociology of Manuel Castells, control of the physical nodes dictates the competitiveness and sovereignty of macro-regions in the global “space of flows”.

More than a mere geographical imbalance, this asymmetry is a systemic risk for the whole Iberian Peninsula. An energy transition built on a digital network that is topologically deficient in the North compromises the operational resilience of the whole Iberian market. The literature on the vulnerability of complex networks, notably the postulates of Albert-László Barabási, shows that systems anchored on a single super-node (Lisbon/Sines) are catastrophically fragile to critical ruptures.

Figure 2 (map of submarine optical fibre cables), from submarinecablemap.com: the submarine cables of the Atlantic and the Mediterranean around the Iberian Peninsula, with the Portuguese landings concentrated on the central and southern coast. © Aprecisa.com
Figure 2 (map of submarine optical fibre cables), from submarinecablemap.com: the submarine cables of the Atlantic and the Mediterranean around the Iberian Peninsula, with the Portuguese landings concentrated on the central and southern coast. © Aprecisa.com

North of the latitude of Lisbon, the infrastructure suffers from a serious topological asymmetry, violating the basic principles of architectural redundancy defined by engineers such as Larry L. Peterson and Bruce S. Davie. From the standpoint of network engineering and of the Iberian integration strategy, this constraint crystallises into three critical vulnerabilities:

1. The Industrial Paradox and the Bottleneck of Iberian Latency

The North and Centre of Portugal operate as the industrial and export engine of the Peninsula. Yet, as far as international data transit is concerned, this macro-region is a node subordinate to the South. In the absence of direct Cable Landing Stations (CLS) in the North, all industrial traffic is forced to drain along terrestrial backhaul routes to Lisbon. As Andrew Blum explains in exposing the physicality of the internet, and as the telemetry data of Alan Mauldin (TeleGeography) corroborate, adding physical terrestrial kilometres critically penalises latency.

Analytical studies by CBRE (2021/2022) and infrastructure policy analyses such as those of Christian Sandvig stress that the absence of topological diversity degrades logistical efficiency. Industry 4.0 demands deterministic paths for intermodal operations, and this absence introduces Single Points of Failure (SPOF) into the peninsular backbones.

2. The Blocking Factor of the Energy and Ocean Transition

The coastline north of Portugal hosts offshore wind generation hubs. Orchestrating this infrastructure requires real-time telemetry, vital for balancing the grid, as has been systematically investigated and championed in the field of smart grids by João Peças Lopes and, on the plane of strategic innovation in the electricity sector, by António Vidigal.

If processing at the edge of the network has to be routed to the South — violating the edge computing optimisation premises advocated by Nicholas Carr —, the system loses effectiveness. Rigorous studies of the vulnerabilities of open-sea systems, led by Michael Sechrist, prove that the joint integration of autonomous maritime assets requires local optical density.

3. False National Redundancy and the Regulatory Warning

Should a disruptive event isolate the southern landing corridor, it is not only Portugal that loses connectivity; the transit routes that feed the interior of Spain collapse. The internet pioneer Vint Cerf and the creator of the Spanning Tree Protocol, Radia Perlman, have warned for decades of the limits of software redundancy over structural physical failures.

The fragility of the longitudinal Portuguese–Spanish paths, analysed from the standpoint of political economy by Dwayne Winseck and of interconnection resilience by David Newman, was demonstrated recently. The President of ANACOM (the Portuguese communications regulator), Sandra Maximiano, publicly highlighted the unacceptability of this cascade effect, showing that merely theoretical redundancy in the South does not shield the North.

The Path to Systemic Mitigation: Completing the Iberian Topological Ring

To comply with the vectors of resilience, the development of new optical corridors in the North is imperative. In a pivotal intervention, the CEO of Altice Portugal, Ana Figueiredo, committed to investing in a new landing point in the Porto basin, a move aligned with the theses of Atlantic decentralisation of the former minister and researcher Manuel Heitor.

Carrying out this technological planning puts into practice the digital sovereignty guidelines laid down by European Commissioners such as Thierry Breton, closing the Iberian ring according to the resilient-infrastructure optimisation models of Javier Salmeron.

Experience dictates: an impenetrable system requires a holistic distribution of Atlantic gateways. A system that is not topologically balanced will always be a system on the verge of rupture.

Author: Eng. Gaspar do Amaral

References and Grounding

This section maps the bibliographical and institutional contributions that underpin the scientific and analytical rigour of the Author’s manifesto:

Annex: Strategic and Regulatory Alignment with the European Commission’s Guidelines (2024–2025)

The thesis defended here by Gaspar do Amaral on the systemic risk of the “digital macrocephaly” in the South and the urgency of establishing an “Iberian Topological Ring” in the North of Portugal is not only a national engineering need, but reflects exactly and coherently the most recent directives and security standards of the European Commission.

Below is shown the direct correspondence between the Author’s warning and the European regulatory framework established by the EU Action Plan on Cable Security (JOIN(2025) 9 final) and by the Report of the Expert Group on the Security and Resilience of EU Submarine Cable Infrastructures (2025).

1. The Risk of Single Points of Failure (SPOF) and the Lack of Route Diversity

2. The Inseparable Interdependence of the Energy and Digital Transitions

3. Financing the Solution: The Iberian Ring as a “Cable Project of European Interest” (CPEI)

Conclusion of the Regulatory Audit

Gaspar do Amaral’s argument anticipates and aligns perfectly with the European Commission’s regulatory urgency. The diagnosis that Portugal suffers from a “digital macrocephaly” in Sines/Lisbon translates, in EU technical jargon, into a dangerous chokepoint (D15). The proposed solution — the development of the northern pole and of the Iberian Ring — meets the exact eligibility requirements set out by Brussels for the new Projects of European Interest (CPEI), guaranteeing true route diversity and the intermodal energy and digital sovereignty of the European Union.

Methodological note

What this page is. An English translation of the article the author published on LinkedIn on 6 April 2026; the full Portuguese version is on this site. The article contains no calculations of its own. The quotations from the EU documents in the annex are translated from the Portuguese of the original; the official English wording may differ.

Changes of form, not substance. The tracking parameters LinkedIn added to some links have been removed, and the two links in the annex, which went through a Google redirect, now point directly to their destination (EUR-Lex and the Commission’s digital strategy site). A stray number in the reference list (“& 5.”) and a typo (“atânticas”) have been corrected. ANACOM is the Portuguese communications regulator.

The discussion is on LinkedIn (in Portuguese)

Comments on this text are made on LinkedIn, where the article was shared in Portuguese. You are welcome to write in English. Agree, disagree or add data: every well-founded objection receives a reply.

Gaspar do Amaral · Original in Portuguese of 6 April 2026, published on this site; translation issued on 30 October 2026 · Figures and tables © Aprecisa.com · AI-assisted

How to cite: Gaspar do Amaral (2026). Como a falta de fibra ótica a Norte de Portugal ameaça a Transição Energética Ibérica. Zenodo. https://doi.org/10.5281/zenodo.23814368 · Permanent archive on Zenodo.